Procedure for pre-sizing

To get the maximum output from an installed system, follow the suggested pre-sizing measures:

Source: https://ecgllp.com/                                                                                                                                                                                                                                                          The post ID for this chapter is 2991. For any suggestion or comment regarding the content, you may write to us at faqs[dot]solar[at]gmail[dot]com. Please quote the post ID in the subject, for better assistance.

 

Points to consider while gathering data about the location:

  • Shadow-casting features and shadow-free area
  • Shadow-casting features and shadow-free area
  • Location for mounting inverter(s) and AC Junction Boxes, typically on terrace/ roof
  • Location for interconnection point (distribution panel of house/ building), typically on ground floor
  • Location where earth pits will be installed

(Check if distribution panel has extra feeder/ interconnection point of sufficient capacity)